Lazar's merits
Authorization type I, Swedish Transport Administration
Quantity controller/measuring officer - Värnamo railway station, rebuilding Sandahls Entreprenad has been commissioned to carry out extensive ground and sewerage works with high safety requirements in a risky environment. The assignment comes from the Swedish Transport Administration, which plans to rebuild Värnamo railway station to increase capacity and reduce maintenance costs.
Contract sum: 75,000,000
Surveyor - Roslagsbanan near Frescati, The project includes new construction of a graded crossing between Roslagsbanan and Ålkistevägen with a new bridge where the road passes under. A ballast-free track must be laid on the bridge. The road and bridge are built within a watertight concrete trough to minimize groundwater subsidence. Differences in height are managed with retaining walls and slopes. The bridge is being built east of the Roslagsbanan.
Contract sum: approx. 75,000,000 SEK
Surveyor - Roslagsbana at Portvägen, the project includes demolition and new construction of a level crossing at Portvägen north of Enebyberg station. The Roslagsbanan will go over a new bridge, while Portvägen and GCvägen pass underneath. A new ballast-free track is to be built on the bridge. Parts of the land must lie within watertight concrete troughs to handle height differences with retaining walls and slopes. The bridge is built in a launch pit east of the Roslagsbanan, and everything is built within sheet piles. At the same time, construction of a pipe tunnel at Gethagsvägen is planned.
Contract sum: approx. 70,000,000 SEK
Surveying engineer - Subway station Nacka Atrium Ljungberg is being built at Sickla station, an important hub for public transport with Tvärbanan, Saltsjöbanan and buses. The station house is planned to be ready in 2024, when the Saltsjöbanan operates the Slussen-Sickla route again. After the completion of the new subway in 2030, Stationshuset will also have a subway entrance for Sickla.
Contract sum: approx. SEK 400,000,000
Metering engineer/quantity controller Henriksdal waterworks BE 08 YIT has taken on a waste project for Stockholm Vatten AB. The project involves an expansion of Henriksdal's treatment plant with the latest treatment technology for future sewage treatment. It will be divided into seven main parts with different types of work.
Contract sum: approx. SEK 650,000,000
Surveying engineer - Trafikplats Roslags-Näsby, preparing a new traffic solution for E18 in Täby. Svevia is being built on behalf of the Swedish Transport Administration to renew the traffic area. The new bridge replaces the existing one, is widened for increased accessibility and safety for pedestrians and cyclists, and is being prepared for future E18 expansion. Two new roundabouts at Centralvägen and reconstruction of entrance and exit ramps are also included for increased traffic safety.
Contract sum: approx. SEK 155,000,000